logotype
  • Home
  • Company
  • Projects
    • Exploration Strategy
    • Nivaldo Project
    • Pedernales Project
    • Somuncurá Project
  • Contact
Get in Touch
logotype
  • Home
  • Company
  • Projects
    • Exploration Strategy
    • Nivaldo Project
    • Pedernales Project
    • Somuncurá Project
  • Contact
Linkedin

Pedernales Project (High-Sulphidation Gold–Silver)

Location and Access

The Pedernales Project is located on the southern Puna Plateau in western Catamarca Province, approximately 200 km north-west of the Bajo de la Alumbrera copper-gold deposit and 65 km east-south-east of the Salares Norte gold–silver deposit in Chile. The project lies within the Mio–Pliocene Maricunga metallogenic belt, a highly prospective precious metals province with established mining operations and infrastructure.

Prospectivity and Exploration Target

The Maricunga belt hosts world-class high-sulphidation epithermal deposits including Salares Norte. Pedernales exhibits strong geological similarities to these systems.

Exploration has defined a large (~8 km-long) advanced argillic alteration system at the Alto Colorado prospect, associated with Ag–As–Pb–Sb–Hg geochemical anomalism and polymictic breccias up to 80m thick.

Integrated datasets and strong analogies to nearby deposits support the presence of concealed gold–silver mineralisation beneath a shallow steam-heated alteration cap.

Pedernales is structurally positioned within a corridor of world-class deposits

District-scale control

The Culampajá Lineament, a major northwest-trending structure, controls mineralisation across the region

Proven endowment

Hosts both epithermal (Salares Norte) and porphyry systems (Alumbrera, Agua Rica)

Discovery analogue

Salares Norte, discovered beneath cover (100–150m), achieved first gold production in April 2024

High-grade benchmark

Salares Norte Open Pit and Stockpile Mineral Reserves 19.99Mt @ 4.9 g/t Au (3.1 Mozs) and 67 g/t Ag (43 Mozs) – 4.2Mozs Aueq

Multiple drill targets defined across large tenement package

Historical drilling missed target

Previous drilling did not test key high-resistivity targets identified by later geophysics

Priority target – Alto Colorado

Extensive 8km alteration zone with large breccias (up to 80m thick)

Compelling analogue

Geological similarities to Salares Norte, with mineralisation expected beneath the alteration cap at depth

Next phase of exploration

Pole-dipole IP and 3,000m drilling program planned (Nov 2027) targeting concealed mineralisation

Alto Colorado target shares geological similarities with the Salares Norte Gold Mine

  • Breccias and flow domes
  • Resistor targets (in blue) below alteration cap
  • High sulphidation, low gold on surface
  • Surface geochemistry

Salares Norte

Alto Colorado*

*Brecha Principal after Combes M., 2019 and Azevedo et al., 2015
*Interpreted geology based on CSAMT and IP geophysics, Rio De Oro 2020

Drilling to target concealed gold deposits below alteration cap

Initial drilling, funded by Newcrest Mining at Alto Colorado Norte, tested only shallow steam-heated alteration and did not adequately test the deeper CSAMT resistivity targets aquired later. Exploration will focus on testing concealed mineralisation along the main alteration corridor. Approximately 2000 m of diamond drilling is planned in 2028 to target CSAMT-defined resistivity anomalies interpreted as feeder structures at depth. Drilling will penetrate the shallow lithocap to evaluate potential high-grade mineralisation beneath.

Geochemical anomalies and deep-seated resistive zones support drill testing potential gold–silver-rich mineralisation at depth

Mega breccia at Doña Inés is thought to be located close to an eruptive vent or at the centre of the heat source

Keep up-to-date with the latest news

Head Office​

Rio De Oro
Level 7, 333 Adelaide Street,
Brisbane Qld 4000

Phone: +61 407 772 714
Email: cn@riodeorocorp.com

Site links

Company
Nivaldo Project
Pedernales Project
Somuncurá Project
Contact
Linkedin
© Rio De Oro | Website by InvestorMax